Update reordering rule

Update an existing rule when its warehouse, supplier item or stock thresholds need to change. The form saves the rule's purchasing settings. Review existing purchase orders separately: a rule change does not cancel or correct an earlier purchase, and changing its warehouse does not transfer stock.

The supported route is Buy. A later eligible replenishment check can use the changed settings to create or add to a Draft purchase order. Saving the edit is separate from that check, purchase confirmation and goods receiving.

Review the current requirement​

Find the rule that covers the requirement you intend to change. Read its product, warehouse, route, minimum and maximum together, and review any related Draft or Confirmed purchase orders before editing it.

Prepare the new values and their reason:

ChangeWhat to review
WarehouseConfirm where replenishment is now needed. Stock is checked in that warehouse; incoming purchases are matched to both the vendor and warehouse.
Supplier itemHave the correct vendor price-list line ready. Check its internal item, variant, packaging, vendor product code and units against the product you intend to replenish.
Minimum stock levelDecide the threshold below which projected supply should trigger a purchase. This is separate from the vendor's minimum order quantity.
Target stock levelDecide the replenishment level after a trigger. Keep it at least as high as the minimum; it is not a fixed quantity to buy.

Check the existing purchase's actual supplier, destination and remaining receiving work before changing the rule's supplier or warehouse. A purchase-order reference is not proof that an earlier order matches the new settings.

For the complete projected-stock calculation and its receipt limits, read the Reorder rule explanation. The comparison includes matching on-hand quantities, matching ordered quantities from Confirmed purchases, and proposals made earlier in the same check. Confirmed incoming does not subtract quantities already received.

Change the saved settings​

Before saving, make sure the revised values are ready to guide purchasing. Only Active rules are eligible for replenishment checks, but an edit does not establish that a check ran or that the rule's eligibility changed. Use the responsible inventory or purchasing owner for an eligibility question; this form has no status input.

  1. Open Inventory → Demand & Replenishment → Reordering Rules. Find the intended rule and choose its Update row action.
  2. In Update reorder rule, wait for the saved settings to load. Confirm that the product and warehouse identify the rule you meant to change before replacing any values.
  3. Review or change warehouse. Select the destination whose stock should be replenished; this changes the rule's scope, rather than moving inventory between warehouses.
  4. If the supplier item is changing, use Vendor product under Order Item to open Select item. Search by description, barcode or vendor product code. Read Price list, Packaging quantity, Minimum quantity and Lead time (days) before selecting the replacement line. Recheck its item, variant, packaging and units.
  5. Enter the intended Minimum inventory level (quantity) and Replenish to target level (quantity). The inputs accept two decimal places. Use the saved values and the intended policy, rather than treating the displayed placeholder as a default. Correct a target below the minimum, and keep Route type set to Buy.
  6. Compare the complete warehouse, supplier-item and quantity combination, then choose Update rule. Wait for the update result before another submission.

The minimum is a strict trigger: projected supply must be below it. At exactly the minimum, this rule does not trigger. When it does trigger, the starting purchase need is target less projected supply; vendor minimums can increase the proposal. Review the resulting purchasing quantity before confirmation.

Check what changed​

Return to Reordering Rules and compare the row's product, warehouse, Route, Min quantity and Max quantity with the intended change. Choose Update again to reopen the saved rule and confirm the supplier selection and numeric values persisted.

Review the related purchase order separately. Its vendor, destination, quantities and receiving progress still need to match the work being managed. Do not treat an older purchase as canceled, redirected or reduced because the rule now has different values.

At a later eligible check, purchasing demand can be added to an existing automatically generated Draft order for the applicable vendor and warehouse. Check the actual draft's vendor and internal quantities, price, packaging and destination. Updating the rule does not guarantee an immediate check, a new separate purchase order or protection against repeated purchasing demand.

Example: lower the trigger without canceling a purchase​

Assume the same item, supplier, warehouse and matching vendor/internal units. Projected supply remains 80 units, with no supplier minimum increasing the proposal. The following values are illustrative:

PolicyComparison at 80 unitsMeaning
Old minimum 100; target 20080 is below 100; starting need is 200 − 80 = 120The old policy meets the trigger.
New minimum 60; target 16080 is above 60This rule does not trigger at that projected supply.

Save the revised minimum and target, then reopen the rule to verify 60 and 160. If a purchase was already created under the old policy, review it separately. The edit has not canceled that purchase or changed physical stock.

If the result needs attention​

SituationWhat to check and do
The wrong rule or unexpected values loadCompare the product and warehouse with the intended requirement before editing. Reopen the correct row rather than overwriting a different rule.
The replacement supplier line is unavailable or has no item or variantHave its vendor price-list mapping corrected, then select a valid line. Recheck product and packaging before saving.
The target is below the minimumCorrect the target or revisit the intended threshold. Rule calculation flags this combination.
A purchase still shows the previous supplier, warehouse or quantityReview that purchase's own status and work. Updating a rule is separate from correcting an existing purchasing document.
A later purchase is larger than the target shortfallCompare its units, vendor minimum and existing Draft lines. A vendor minimum or added draft demand can explain a different amount.
The update fails or its outcome is uncertainReopen the saved rule and inspect its current values before retrying. Keep the returned message and product/warehouse references together when asking the responsible owner to investigate.

FAQ​

Business questions​

Does lowering the threshold cancel an earlier purchase order?​

No. The update changes the rule's settings. Review an earlier purchase order separately, including its status and any receiving work, before deciding how to handle that purchase.

Does changing the warehouse transfer existing stock?​

No. It changes where the rule compares supply and prepares later purchasing demand. It does not perform a stock movement or redirect an existing purchase order.

What should I review before changing the supplier item?​

Check the replacement price-list line's product mapping, variant, packaging, vendor code, units and minimum quantity. Review existing purchases for the old supplier item separately so their quantities and destinations remain clear.

Technical questions​

Why is a target below the minimum invalid?​

The minimum decides when replenishment is considered, while the target supplies the level used to calculate the starting shortfall. Rule calculation flags a target below the minimum. Correct the two values before relying on the revised policy.

Will projected supply exactly equal to the minimum trigger a purchase?​

No. The check requires projected supply to be strictly below the minimum. Equality does not trigger this rule, even after you save a new threshold.

How can I verify that my update was saved?​

Find the rule in Reordering Rules, compare its product, warehouse and quantities, then reopen it with Update. Check the loaded supplier selection, minimum, target and Buy route against the values you intended.