Reordering Rules

Use reordering rules to define when to buy more of an item for a warehouse and the stock level to replenish toward. This work starts with supplier-item and warehouse setup, continues through an eligible supply check, and hands Draft purchasing demand to Purchasing.

Open Inventory → Demand & Replenishment → Reordering Rules. Saving a rule, creating a purchase order and receiving stock are separate checkpoints. The supported replenishment route here is Buy.

When an eligible rule is checked, the purchasing decision follows this path:

Prepare the requirement and supporting records​

Read the supplier item and warehouse together before choosing thresholds. The selected vendor price-list line supplies the internal item, variant and packaging, while its price list supplies the vendor. The warehouse identifies where stock is needed and where the resulting normal purchase is directed.

Check these conditions before relying on the rule:

AreaReadiness check
Supplier itemThe price-list line exists and maps to the intended internal item and variant. Product code, packaging and units identify the intended purchase.
WarehouseThe selected warehouse is the destination whose supply you need to replenish.
Threshold policyMinimum and target quantities describe the intended stock policy, in the item's units. The target is at least the minimum.
Existing demandOther rules and Draft or Confirmed purchases for the item have been reviewed, including supplier, warehouse and receipt progress.
Vendor termsMatching pricing, minimum purchase quantity and delivery information support a usable Draft order.

A vendor minimum is an order constraint. It is separate from the minimum stock level used to decide when to replenish.

Create or revise the saved rule​

Use the table's Product, warehouse, Route, Min quantity and Max quantity to identify the requirement. Read the product configuration and units with those values, rather than grouping unlike variants or packaging by name alone.

Choose the appropriate task:

SituationTask and result
A requirement needs its first ruleCreate reordering rule saves the selected supplier item, warehouse, minimum, target and Buy route.
An existing requirement has changedUpdate reordering rule loads and changes that rule's saved settings. Review existing purchases separately when changing supplier, warehouse or quantities.

After saving, find the rule and reopen it with Update to compare the saved inputs. This verifies the settings; it does not establish that a replenishment check has run.

The row's Delete action asks for confirmation before removing a rule. Use it when the rule itself should be removed, and review outstanding purchases separately. Removing or updating the rule does not cancel purchases or reverse stock movements.

Establish eligibility before expecting purchasing demand​

Only Active rules are considered by the replenishment check. A saved row is not proof of eligibility or a purchase. Have the inventory or purchasing owner verify eligibility and supporting setup before relying on automatic replenishment.

Saving or updating the settings does not establish an exact next run time. If a purchase is expected, check the actual resulting purchasing records and the requirement being evaluated. Do not repeatedly create or update rules merely because an expected order has not appeared yet.

Follow the projected-supply decision​

The check compares the minimum with:

Projected supply = matching on-hand quantity + matching Confirmed purchase quantities + quantities proposed earlier in the same check.

Stock is looked up for the item's configuration in the chosen warehouse. Confirmed incoming purchases must match the vendor and warehouse. Earlier proposals are tracked within that vendor-and-warehouse check, so the same check can account for quantities already being prepared for the matching item.

The trigger is strict: projected supply must be below the minimum. Equality does not trigger. Once triggered, the starting purchase need is target − projected supply, subject to matching vendor pricing and minimum purchase quantities. A vendor minimum can raise the proposal above the target shortfall.

The incoming comparison has an important limit: it uses the first matching line's full ordered quantity on each Confirmed purchase order, without subtracting receipts. Draft orders and other purchase statuses are outside that incoming total. Review partial receipts, repeated matching lines and actual outstanding quantities before treating the projection as supply still due. The Reorder rule reference explains the complete calculation and matching choices.

Review the Draft purchase and hand off the work​

A triggered rule can create a new Draft purchase order or add to an existing automatically generated Draft for the vendor and warehouse. Matching purchasing lines can be merged. The result is purchasing demand, not received stock.

Existing drafts are excluded from the Confirmed incoming total. A later check can therefore add further quantities to a draft; local proposal tracking is not a guarantee against repeated demand across separate checks or suppliers. Review the actual draft before confirming it.

Use the purchase order to compare:

  • The vendor, warehouse and selected internal item, variant and packaging.
  • Vendor and internal units, ordered quantities and any existing merged demand.
  • Price, vendor minimums, planned dates and line messages.
  • Actual receipt progress on existing purchases when reconciling supply.

Hand off the identified Draft purchase with those comparisons complete. Purchasing confirmation and goods receiving continue separately. If the rule's supplier, warehouse or thresholds have changed, do not assume an older order has been canceled, redirected or reduced to match.

Check progress or investigate an exception​

Checkpoint or symptomWhat it means and what to inspect
Saved settings are presentSetup exists. Reopen the rule and compare the supplier item, warehouse and thresholds. Eligibility and check execution still need to be established.
On-hand stock is below the minimum but no purchase appearsCompare projected supply, including matching Confirmed orders and earlier proposals. Also check eligibility and valid supplier/pricing references.
A new or changed Draft purchase existsMatch its actual vendor, warehouse, items, units and quantities to the requirement. Review added demand before confirmation.
A proposal exceeds the target shortfallCheck vendor minimums, unit conversion and quantities already on the draft.
The supplier line is unavailable or has no internal item or variantCorrect the vendor price-list mapping, then review the rule's saved selection.
A rule was updated or removed but an old purchase remainsManage that purchase separately according to its own status and receiving work. A rule change is not a purchase correction.
Saving or checking reports an uncertain resultInspect current rules and purchases before another attempt. Keep the returned message and item, vendor and warehouse references together for investigation.

Example: setup to purchasing handoff​

Assume one eligible rule, matching vendor and internal units, no earlier proposal in this check, a minimum of 100 units and a target of 200 units. These values are illustrative.

The check finds 40 units on hand and counts 30 ordered units from matching Confirmed purchases. Projected supply is 70 units, below 100. The starting need is 200 − 70 = 130 units. If the matching vendor option requires at least 150 units, the purchasing proposal rises to 150.

Review the actual Draft order for that quantity, supplier and warehouse. The comparison now represents 70 + 150 = 220 units, but the proposed 150 units have not arrived. Review any receipts behind the 30-unit incoming contribution separately, because that contribution uses ordered quantity. At projected supply of exactly 100, this rule would not trigger.

FAQ​

Business questions​

What shows that the work has reached Purchasing?​

A new or updated Draft purchase order with the intended vendor, warehouse, item and quantities is the purchasing handoff. Review that order and identify the demand it contains. A saved rule alone does not establish that purchasing demand was created.

Does every saved rule produce a purchase order?​

No. The rule must be eligible for a check, its references and pricing must be usable, and projected supply must be below its minimum. Saving the rule is a setup checkpoint, separate from the resulting purchase.

Does changing or removing a rule cancel outstanding purchases?​

No. Rule maintenance changes or removes the replenishment configuration. Review outstanding purchase orders separately using their own status, quantities and receipt progress.

Technical questions​

Why might low on-hand stock produce no new purchase?​

The check compares projected supply, which adds matching Confirmed purchase quantities and proposals already prepared in the same vendor-and-warehouse check to on-hand stock. Those additions can keep the projection at or above the minimum. Eligibility or missing supplier/pricing information can also prevent a result.

Why can a Draft order exceed the target shortfall?​

A vendor minimum can raise the proposed quantity. A check can also add demand to an existing automatic draft. Compare the draft's units, vendor minimum and existing lines before confirming it.

Is the incoming quantity the amount still to receive?​

No. The check uses the full ordered quantity from the first matching line on each Confirmed purchase order, without subtracting receipts. Compare actual receipt progress and any repeated matching lines before interpreting the projection as supply still due.