Use Inventory → Demand & Replenishment → Cycle Counts to review an inventory check and follow its final reconciliation. Begin with the Cycle count number, warehouse, and Status so that the quantities you review belong to the intended occurrence.

Locate the counting stage​

The schedule defines recurring item selection and tolerance. A generated count records the particular stock being checked. Use Cycle Count Details on the row to inspect it.

StatusWhat to review
ScheduledThe generated warehouse and item/lot lines are waiting for counted results to be confirmed.
ConfirmedCounted quantities have been recorded. Review acceptance and approved totals before final reconciliation.
CompletedCheck the accepted results, any recount, and resulting movements and stock balances.

Count approval records results and sets Confirmed; it does not itself post stock changes. The row's complete action is offered for Confirmed counts.

Review quantities before reconciliation​

Match item, variant, unit, packaging, attributes, and lot. Then distinguish the physical Counted Quantity, refreshed Stock quantity, and Approved quantity. Approved quantity is the accepted total, not the difference to add or remove.

Read the schedule's item tolerance with the approved difference. For example, 100 units of stock and an approved total of 96 differ by 4. A tolerance of 4 creates no movement; a tolerance of 2 makes that difference exceed tolerance. These are illustrative quantities.

A line left unaccepted is carried into a separate Scheduled recount with its counted quantity reset to zero. Keep the original and recount references together when tracking unfinished checking work.

The Cycle count record explains these values, valuation, and exceptions. Read it before interpreting a Completed status as proof that stock matches every counted result.

Complete only the case you have checked​

The completion guide covers first-time, whole-unit completion where accepted lines have positive refreshed stock and every accepted difference is within or equal to tolerance, so no adjustment movement is needed. It explains the acceptance controls and the checks before submission.

Pause final submission for any accepted difference beyond tolerance, including lot reductions, stock increases, or a mixture of both. Also have found stock on zero-stock lines reviewed. The completion guide does not provide an adjustment-posting procedure for those cases. Do not change Approved quantity or an acceptance decision to work around the review.

Verify the result and remaining work​

After completion, compare the count's status with its accepted totals, any new recount, and the completed adjustment movements. Use Movement History and Stock to check the affected product, lot, location, quantity, and value.

A Completed count can include differences left unchanged within tolerance and lines sent for recounting. Follow those outcomes separately before handing the physical check over as finished. If a posting result is unclear, inspect the count and its movements before repeating the request.

FAQ​

Business questions​

Where do I begin when checking a count's progress?​

Match Cycle count number and warehouse, then read Status and Cycle Count Details. Scheduled, Confirmed, and Completed describe different stages of that occurrence.

Does Completed mean every result was accepted?​

No. Unaccepted lines continue in a separate Scheduled recount. Differences within or equal to tolerance also create no movement, so review the actual outcomes.

When should I pause final completion for another review?​

Pause for any accepted difference beyond tolerance, including a reduction or increase, and for found stock on zero-stock lines. The completion guide covers first-time completion that needs no movement and does not supply an adjustment-posting procedure.

Technical questions​

What belongs in Approved quantity?​

The approved total in the item's quantity unit. Against 100 units of stock, approving 96 means a difference of 4; entering 4 would approve a total of 4.

Why can a difference produce no movement?​

An accepted difference whose absolute size is within or equal to the schedule item's tolerance creates no adjustment movement.

What should I inspect after completion?​

Check the count's status, accepted totals, recount records, and completed adjustment movements. Compare the affected stock by product, lot, location, and quantity before concluding the review.