Sales Pipeline settings
Sales Pipeline settings hold the refresh cadence for importing ConstructConnect leads. Use this record to understand when an import is eligible to run and why an attempted refresh may bring in no new feed.
Pull from ConstructConnect is the relevant choice in the pipeline settings form. It controls a refresh interval; selecting an interval does not establish that a new feed is available or that an import has completed.
Choose a cadence for the feed
Choose the interval that fits how often your team needs new construction leads and reviews the incoming work. The available choices are Every 24 hours, Every 2 days, Every 5 days, Every 7 days, Every 14 days, Every 30 days, and Never.
Never stops the import before it reads the feed. A newly initialized settings record uses Never. If your team expects scheduled imports, have the person responsible for the connection confirm both the saved interval and the availability of the ConstructConnect connection.
For a timed interval, an import attempt checks the elapsed time since the last successful import. If the interval has not elapsed, it skips the run. The cadence is an eligibility check whenever import processing runs; do not treat it as a promise of a particular arrival time.
Interpret an unchanged lead list
An eligible attempt still needs the configured ConstructConnect connection and a usable feed. It also checks whether the newest feed file has already been imported. An already processed file is skipped rather than imported again.
For example, with Every 2 days selected, an attempt one day after the last successful import is too early. Once two days have elapsed, the attempt can continue, but it may still skip an unchanged feed. These intervals illustrate the setting; the example does not establish when your workspace schedules the attempt.
When expected leads are absent, compare the saved cadence with the last successful import, then have the connection owner inspect the feed and any import error. Check the Leads list for the expected project before attempting another import.
Keep ingestion separate from sales follow-up
The cadence governs the external feed. Your sales work remains on the lead, opportunity, and activity records. Choose a follow-up date and owner on an activity when you need someone to act; a shorter feed interval does not schedule that person's work.
FAQ
Business questions
Which source does this pipeline setting control?
It controls the ConstructConnect lead feed. The pipeline settings form identifies the source as ConstructConnect and provides its refresh cadence.
How should I choose a refresh interval?
Choose from the available daily or multi-day intervals to match how often your team reviews incoming construction leads. Allow for the feed's availability: an eligible attempt can still skip a file that has already been imported.
How can I pause feed imports?
Use Never for Pull from ConstructConnect. Import processing checks this setting before reading the feed and stops when Never is selected.
Technical questions
What cadence does a newly initialized settings record use?
It uses Never. Confirm the saved value before expecting the external feed to import.
From what time is the interval measured?
Import processing measures the interval from the last successful import. If that interval has not elapsed, the attempted run is skipped.
Why might an eligible attempt still add no leads?
The newest feed file may already have been imported. Processing also requires the configured connection and usable feed files; have the connection owner inspect those conditions and any reported error, then check actual Leads before retrying.